This Front Royal, VA homeowner had an uninsulated second floor cathedral ceiling and a bump out cantilever that was also uninsulated.
Solution
We chose to dense pack these areas with cellulose in order to provide a thermal barrier with limited disruption inside the house.
Tough work due to how high the work was off ground level.
Project Summary
consultant: justin dobson
Installer: Ismael Nieto
Setting up the work platform.
Drilling the fascia board with holes to dense pack the cathedral ceiling.
Packing the ceiling. Air and mechanical compression are combined to create a densely packed thermal barrier.
A packed rafter bay.
Installing the wood plugs.
Fascia board after we are done plugging the holes.
Dense packing the cantilever.
Happy installer after a hard day's work!